Permission from the network owner is required for asset relocations, and we can liaise directly with them, simplifying the process for you. This includes applying to the network to relocate the asset, designing the new layout, procuring any equipment or infrastructure that is required, and overseeing the onsite construction process.
We will:
find the most appropriate way to manage the relocation of overhead or underground electrical assets for major projects including new road construction works.
retire or upgrade existing electrical assets on your property, or on the road alongside your property.
establish new point of supply or upgrade existing supply to suit the needs of your project.
We talk with you to determine the most cost effective, technically suitable and commercially appropriate way to move or decommission and reinstate assets as quickly as possible, saving your project time and money. We can minimise the impact and cost of electrical assets on your project, liaise with the network owner, while maximising the value of your project result.
The cost to you is often less or the same as going directly through the network, and the timeframe for us to complete the work is often shorter.
Site Designed and Built By Section Media